Русская версия

Search document title:
Content search 1 (fast):
Content search 2:
ENGLISH DOCS FOR THIS DATE- Forcing a PC - B690511-2 | Сравнить
- Meter Trim Check (TECH, QUAL) - B690511 | Сравнить
- Meter Trim Check (TECH, QUAL) - B690511R78 | Сравнить

RUSSIAN DOCS FOR THIS DATE- Принуждение ПК - Б690511-2R69 | Сравнить
- Проверка Отстройки Е-метра - Б690511 | Сравнить
CONTENTS METER TRIM CHECK Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 11 MAY 1969R
REVISED 8 JULY 1978
(Replaces HCOB of 27 July 1966 same name)
Remimeo All Orgs Exec Secs Qual Sec All Tech Hats All Qual Hats Dianetic Course (Revisions in this type style) (Tech Div)
(Qual Div)

METER TRIM CHECK

E-Meters can go out of trim during a session because of temperature changes.

Thus even if the meter is properly calibrated and reads at 2.0 with a 5,000 ohm resistor across the leads and 3.0 with 12,500 ohms by the end of the session a pc can be apparently reading below 2.0 because the meter is off trim.

The following meter procedure is therefore to be followed AT THE END OF EACH SESSION (AFTER GIVING “END OF SESSION.”):

  1. DON’T MOVE THE TRIM KNOB
  2. PULL OUT THE JACK PLUG
  3. MOVE THE TA UNTIL THE NEEDLE IS ON ‘SET’ AT THE SENSITIV- ITY YOU WERE USING IN THE SESSION
  4. RECORD THE TA POSITION AT THE BOTTOM OF THE AUDITOR’S REPORT FORM AS:
    “Trim check - TA = ....”
  5. IF YOUR METER IS KNOWN TO BE OUT OF CALIBRATION (as in para 2 above) RECORD ALSO: “Calibration error ..... on meter = 2.0 actual” at the bottom of the form.
L. RON HUBBARD
Founder
LRH:lb-r.cs.an.ei.cden.nc